Power Circle International, Inc.

Our Clients
We work with these great companies and many more.
TELEPERFORMANCE1

TELEPERFORMANCE PHILS

PROJECTS

  • Project Location:  9TH FLR. EAST TOWER, TEKTITEBLDG ORTIGAS CTR. PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF LABOR, MATERIALS, INSTALLATION TESTING, AND COMMISSIONING OF THE ELECTRICAL SYSTEM INCLUDING PANEL BOARDS & MTS, ATS, & ECB’S
  • Date Start:
  • Date Completed:  NOVEMBER 20, 2004
  • Project Location:  OCTAGON BUILDING, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, INCLUDING TESTING & COMMISSIONING OF THE ELECTRICAL SYSTEM
  • Date Start:
  • Date Completed:  MAY 28, 2005
  • Project Location:  ORTIGAS CENTER PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR INCLUDING SUPERVISION FOR THE TELEPERFORMANCE CALL
  • Date Start:
  • Date Completed: FEBRUARY 15, 2006
  • Project Location:  BACOLOD CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 6, 2007

TELEPERFORMANCE PHILS

PROJECTS

  • Project Location:  OCTAGON BUILDING, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, INCLUDING TESTING & COMMISSIONING OF THE ELECTRICAL SYSTEM
  • Date Start:
  • Date Completed:  MAY 28, 2005
  • Project Location:  9TH FLR. EAST TOWER, TEKTITEBLDG ORTIGAS CTR. PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF LABOR, MATERIALS, INSTALLATION TESTING, AND COMMISSIONING OF THE ELECTRICAL SYSTEM INCLUDING PANEL BOARDS & MTS, ATS, & ECB’S
  • Date Start:
  • Date Completed:  NOVEMBER 20, 2004
  • Project Location:  ORTIGAS CENTER PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR INCLUDING SUPERVISION FOR THE TELEPERFORMANCE CALL
  • Date Start:
  • Date Completed: FEBRUARY 15, 2006
  • Project Location:  BACOLOD CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 6, 2007
ROCKWELL1

ROCKWELL LAND PHILS

PROJECTS

  • Project Location:  ROCKWELL, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, INCLUDING TESTING & COMMISSIONING OF THE ELECTRICAL SYSTEM
  • Date Start:
  • Date Completed:  JUNE 13, 2006
  • Project Location:  C-5 PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 22, 2009
  • Project Location:  SANTOLAN, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 14, 2012
  • Project Location:  ROCKWELL COMPOUND MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: SEPTEMBER 22,2015
  • Project Location:  ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: SEPTEMBER 15, 2017
  • Project Location:  4F POWER PLANT MALL, ROCKWELL CENTER, MAKATI CTY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 4,2018
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 08, 2018
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 12, 2021
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 8, 2022
  • Project Location:  GF PROCENIUM PHASE 1, ESTRELLA ST. ROCKWELL CENTER, MAKATI CITY
  • Floor Area:  660 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:  SEPTERMBER 2, 2022
  • Date Completed:  MARCH 27, 2023

ROCKWELL LAND PHILS

PROJECTS

  • Project Location:  ROCKWELL, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, INCLUDING TESTING & COMMISSIONING OF THE ELECTRICAL SYSTEM
  • Date Start:
  • Date Completed:  JUNE 13, 2006
  • Project Location:  C-5 PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 22, 2009
  • Project Location:  SANTOLAN, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 14, 2012
  • Project Location:  ROCKWELL COMPOUND MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: SEPTEMBER 22,2015
  • Project Location:  ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: SEPTEMBER 15, 2017
  • Project Location:  4F POWER PLANT MALL, ROCKWELL CENTER, MAKATI CTY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 4,2018
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 08, 2018
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 12, 2021
  • Project Location:  ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 8, 2022
  • Project Location:  GF PROCENIUM PHASE 1, ESTRELLA ST. ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 2022
BDO2

BDO

PROJECTS

  • Project Location:  BDO BLDG. 1 & 2, ORTIGAS AVE. COR. ROOSEVELT ST. SAN JUAN, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 29, 2011
  • Project Location:  GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 20, 2017
  • Project Location:  GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: FEBRUARY 21, 2017
  • Project Location:  2ND FLOOR BUILDING1 – ROOSEVELT
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: AUGUST 31, 2018
  • Project Location:  PASEO DEROXAS, MAKATI AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 07,2018
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 19, 2020
  • Project Location:  THE PODIUM WEST TOWER, NO. 12 ADB AVE. ORTIGAS CENTER MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 27, 2020
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF PERMIT
  • Date Start:
  • Date Completed: FEBRUARY 22, 2021
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: OCTOBER 16, 2021
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: FEBRUARY 16, 2022

BDO

PROJECTS

  • Project Location:  BDO BLDG. 1 & 2, ORTIGAS AVE. COR. ROOSEVELT ST. SAN JUAN, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 29, 2011
  • Project Location:  GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 20, 2017
  • Project Location:  GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: FEBRUARY 21, 2017
  • Project Location:  2ND FLOOR BUILDING1 – ROOSEVELT
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: AUGUST 31, 2018
  • Project Location:  PASEO DEROXAS, MAKATI AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 07,2018
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2020
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 19, 2020
  • Project Location:  THE PODIUM WEST TOWER, NO. 12 ADB AVE. ORTIGAS CENTER MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 27, 2020
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF PERMIT
  • Date Start:
  • Date Completed: FEBRUARY 22, 2021
  • Project Location:  8741 PASEO DE ROXAS MAKATI AVENUE, MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: OCTOBER 16, 2021
  • Project Location:  156 VALERO STREET, SALCEDO VILLAGE MAKATI CITY
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: FEBRUARY 16, 2022
SOLAR1

SOLAR ENTERTAINMENT CORP.

PROJECTS

  • Project Location:  3F, WORLDWIDE CORPORATE CENTER,SHAW BOULEVARD, MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: JULY 27, 2011
  • Project Location:  3F & MEZZANINE, WORLD WIDE CORPORATE CENTER, SHAW BLVD., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 09, 2013

SOLAR ENTERTAINMENT CORP.

PROJECTS

  • Project Location:  3F, WORLDWIDE CORPORATE CENTER,SHAW BOULEVARD, MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: JULY 27, 2011
  • Project Location:  3F & MEZZANINE, WORLD WIDE CORPORATE CENTER, SHAW BLVD., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 09, 2013
CONVERGYS1

CONVERGYS PHILS

PROJECTS

  • Project Location:  STA.ROSA, LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 05, 2008
  • Project Location:  STA.ROSA, LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 05, 2008
  • Project Location:  FELIX HUERTAS, ST., SAMPALOC, MANILA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2008
  • Project Location:  QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: NOVEMBER 23, 2009
  • Project Location:  STA. ROSA LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 19, 2010
  • Project Location:  ALABANG
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JUNE 24, 2010
  • Project Location:  8F-11F, I HUB 3 BUILDING, NORTHGATE CYBERZONE FILINVEST, CORPORATECITY, ALABANG, MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JULY 26, 2011
  • Project Location:  2F-4F BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JANUARY 15, 2014

CONVERGYS PHILS

PROJECTS

  • Project Location:  STA.ROSA, LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 05, 2008
  • Project Location:  STA.ROSA, LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 05, 2008
  • Project Location:  FELIX HUERTAS, ST., SAMPALOC, MANILA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2008
  • Project Location:  QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: NOVEMBER 23, 2009
  • Project Location:  STA. ROSA LAGUNA
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 19, 2010
  • Project Location:  ALABANG
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JUNE 24, 2010
  • Project Location:  8F-11F, I HUB 3 BUILDING, NORTHGATE CYBERZONE FILINVEST, CORPORATECITY, ALABANG, MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JULY 26, 2011
  • Project Location:  2F-4F BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JANUARY 15, 2014
DTSI1

DIVERSIFIED TECHNOLOGY SOLUTIONS INT'L., INC.

PROJECTS

  • Project Location:  17F & 18F, ALPHALAND SOUTHGATE TOWER, 2258 CHINO ROCES AVE. COR. EDSA MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 19, 2010
  • Project Location:  2F BLDG. H UP-AYALA LAND TECHNOHUB, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 15, 2010
  • Project Location:  GF-5F, FILINVESTBLDG., 167 EDSA,  BRGY.WACK- WACK  GREENHILLSEAST, MANDALUYO G CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS & LABOR FOR ELECTRICAL &FDAS WORKS
  • Date Start:
  • Date Completed:  JULY 09, 2012
  • Project Location:  4F, BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 04, 2012
  • Project Location:  1F PHASE 1&2, BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 15, 2014
  • Project Location:  GF -4F, TWO GLOBAL CENTER, MEGAWORLDS BLVD., ILO-ILO BUSINESS PARK, AIRPORTRD., MANDURRIAO DISTRICT, ILO-ILO CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 07, 2014
  • Project Location:  3F, SM DASMARINAS, GOVERNOR’SDRIVE, DASMARINAS CAVITE
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS WORKS
  • Date Start:
  • Date Completed:  JULY 18, 2014
  • Project Location:  SILVER CITY 3, FRONTERAVERDE, ORTIGASAVENUE, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS FOR MECHANICAL EQUIPMENT
  • Date Start:
  • Date Completed: DECEMBER 12, 2014
  • Project Location:  SM LIPA BATANGAS CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: JUNE 03, 2015
  • Project Location:  TIENDISITAS, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: AUGUST 29,2015
  • Project Location:  TIENDISITAS, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: NOVEMBER 01, 2015
  • Project Location:  UP AYALA TECHNO HUB Q.C.
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS WITH MECHANICAL WORKS(2ND FLOOR- BUILDING)
  • Date Start:
  • Date Completed: MAY 31, 2016
  • Project Location:  GF & 4TH FLOOR SM TAYTAY, RIZAL
  • Floor Area:
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: JULY 27, 2016
  • Project Location:  4HT FLOOR ATC BPO I MADRIGAL AVE., ALABANG
  • Floor Area:
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed: JULY 29, 2016
  • Project Location:  ARANETA CUBAO, QUEZON CITY
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: FEBRUARY 01, 2017
  • Project Location:  2ND & 3RD FLOOR SM TAYTAY, RIZAL
  • Floor Area:
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed: APRIL 06, 2017
  • Project Location:  7TH & 8TH FLOOR SM CITY STA. ROSA LAGUNA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 29, 2017
  • Project Location:  MAKATI CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MAY 26, 2017
  • Project Location:  SYCIP LAW CENTER, PASEO DE ROXAS, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 08,2017
  • Project Location:  COMMERCE & INDUSTRY PLAZA, 1631,1030 CAMPUS AVENUE, TAGUIG, 1634 METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 08, 2017
  • Project Location:  ALLIANCE GLOBAL TOWER, BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 04,2018
  • Project Location:  FESTIVEMALL SM ILOILO, MANDURIAO, ILOILOCITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 28,2018
  • Project Location:  TWENTYFIVE SEVENMCKINLEY, 7TH AVE., COR. 25THY,BGC, TAGUIGCITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 13, 2018
  • Project Location:   12F CYBERPARK TOWER 1, AGUINALDO AVE. CENTER, CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 22, 2018
  • Project Location:  10TH & 11TH FLOOR AYALA NORTH EXCHANGE TOWER 2, AYALA AVE., COR. SALCEDO ST. LEGASPI VILLAGE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 26, 2018
  • Project Location:  3F BLDG P, UP- AYALA LAND TECHNOHUB COMMONWEALTH AVE., QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 12, 2018
  • Project Location:  6F SM CLARK, MA ROXAS AVE. ANGELES CITY, PAMPANGA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2019
  • Project Location:  8-9TH FLOOR GEN. MCARTHUR AVE. ARANETA CENTER CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 12, 2019
  • Project Location:  2 TECHNO BLDG., FINANCE CENTER 4F-6F, DAVAO CTIY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 15, 2019
  • Project Location:  5F 2 TECHNO BLDG. ILOILO CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 15, 2019
  • Project Location:  18TH FLOOR, WORLD COMMERCE PLACE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JUNE 21, 2019
  • Project Location:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 02, 2020

DIVERSIFIED TECHNOLOGY SOLUTIONS INT'L., INC.

PROJECTS

  • Project Location:  17F & 18F, ALPHALAND SOUTHGATE TOWER, 2258 CHINO ROCES AVE. COR. EDSA MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 19, 2010
  • Project Location:  2F BLDG. H UP-AYALA LAND TECHNOHUB, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 15, 2010
  • Project Location:  GF-5F, FILINVESTBLDG., 167 EDSA,  BRGY.WACK- WACK  GREENHILLSEAST, MANDALUYO G CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS & LABOR FOR ELECTRICAL &FDAS WORKS
  • Date Start:
  • Date Completed:  JULY 09, 2012
  • Project Location:  4F, BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 04, 2012
  • Project Location:  1F PHASE 1&2, BLDG. L UP-AYALA LAND TECHNOHUB NORTH SCIENCE & TECHNOLOGY PARK, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 15, 2014
  • Project Location:  GF -4F, TWO GLOBAL CENTER, MEGAWORLDS BLVD., ILO-ILO BUSINESS PARK, AIRPORTRD., MANDURRIAO DISTRICT, ILO-ILO CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 07, 2014
  • Project Location:  3F, SM DASMARINAS, GOVERNOR’SDRIVE, DASMARINAS CAVITE
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS WORKS
  • Date Start:
  • Date Completed:  JULY 18, 2014
  • Project Location:  SILVER CITY 3, FRONTERAVERDE, ORTIGASAVENUE, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS FOR MECHANICAL EQUIPMENT
  • Date Start:
  • Date Completed: DECEMBER 12, 2014
  • Project Location:  SM LIPA BATANGAS CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: JUNE 03, 2015
  • Project Location:  TIENDISITAS, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: AUGUST 29,2015
  • Project Location:  TIENDISITAS, ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed: NOVEMBER 01, 2015
  • Project Location:  UP AYALA TECHNO HUB Q.C.
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS WITH MECHANICAL WORKS(2ND FLOOR- BUILDING)
  • Date Start:
  • Date Completed:  MAY 31, 2016
  • Project Location:  GF & 4TH FLOOR SM TAYTAY, RIZAL
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 27, 2016
  • Project Location:  4HT FLOOR ATC BPO I MADRIGAL AVE., ALABANG
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 29, 2016
  • Project Location:  ARANETA CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 01, 2017
  • Project Location:  2ND & 3RD FLOOR SM TAYTAY, RIZAL
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 06, 2017
  • Project Location:  7TH & 8TH FLOOR SM CITY STA. ROSA LAGUNA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 29, 2017
  • Project Location:  MAKATI CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MAY 26, 2017
  • Project Location:  SYCIP LAW CENTER, PASEO DE ROXAS, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 08,2017
  • Project Location:  COMMERCE & INDUSTRY PLAZA, 1631,1030 CAMPUS AVENUE, TAGUIG, 1634 METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 08, 2017
  • Project Location:  ALLIANCE GLOBAL TOWER, BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 04,2018
  • Project Location:  FESTIVEMALL SM ILOILO, MANDURIAO, ILOILOCITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 28,2018
  • Project Location:  TWENTYFIVE SEVENMCKINLEY, 7TH AVE., COR. 25THY,BGC, TAGUIGCITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 13, 2018
  • Project Location:   12F CYBERPARK TOWER 1, AGUINALDO AVE. CENTER, CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 22, 2018
  • Project Location:  10TH & 11TH FLOOR AYALA NORTH EXCHANGE TOWER 2, AYALA AVE., COR. SALCEDO ST. LEGASPI VILLAGE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 26, 2018
  • Project Location:  3F BLDG P, UP- AYALA LAND TECHNOHUB COMMONWEALTH AVE., QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 12, 2018
  • Project Location:  6F SM CLARK, MA ROXAS AVE. ANGELES CITY, PAMPANGA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 21, 2019
  • Project Location:  8-9TH FLOOR GEN. MCARTHUR AVE. ARANETA CENTER CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 12, 2019
  • Project Location:  2 TECHNO BLDG., FINANCE CENTER 4F-6F, DAVAO CTIY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 15, 2019
  • Project Location:  5F 2 TECHNO BLDG. ILOILO CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 15, 2019
  • Project Location:  18TH FLOOR, WORLD COMMERCE PLACE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JUNE 21, 2019
  • Project Location:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  SEPTEMBER 02, 2020
DPC1

DPC PTE. LTD.

PROJECTS

  • Project Location:  20F, TOWER 2 RCBCPLAZA, AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 30, 2011
  • Project Location:  8F, NET LIMABLDG.,5TH AVE., COR.26THST.COR. E SQUARE,CRESCENT PARK WEST,BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 30, 2011

DPC PTE. LTD.

PROJECTS

  • Project Location:  20F, TOWER 2 RCBCPLAZA, AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 30, 2011
  • Project Location:  8F, NET LIMABLDG.,5TH AVE., COR.26THST.COR. E SQUARE,CRESCENT PARK WEST,BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  APRIL 30, 2011
MANILA HOTEL1

MANILA HOTEL

PROJECTS

  • Project Location:  ONE RIZAL PARK, MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed: OCTOBER 20, 2010

MANILA HOTEL

PROJECTS

  • Project Location:  ONE RIZAL PARK, MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed: OCTOBER 20, 2010
MAKATI MEDICAL CENTER1

MAKATI MEDICAL CENTER

PROJECTS

  • Project Location:  5F, TOWER1, MAKATI MEDICALCENTER, LEGASPIVILLAGE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 02, 2010

MAKATI MEDICAL CENTER

PROJECTS

  • Project Location:  5F, TOWER1, MAKATI MEDICALCENTER, LEGASPIVILLAGE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 02, 2010
MEGAWORLD1

MEGAWORLD CORP.

PROJECTS

  • Project Location:  SAN JUAN CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed:  JUNE 15, 2010
  • Project Location:  SAN JUAN CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed:  JUNE 24, 2010
  • Project Location:  WORLDWIDE PLAZA BUILDING, UPTOWN AREA, BONIFACIO GLOBAL CITY (BGC), TAGUIG, MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  FEBRUARY 11, 2021

MEGAWORLD CORP.

PROJECTS

  • Project Location:  SAN JUAN CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed:  JUNE 15, 2010
  • Project Location:  SAN JUAN CITY, METRO MANILA
  • Floor Area:
  • Scope:  SUPPLY OF LABOR INCLUDING MISCELLANEOUS AND CONSUMABLE
  • Date Start:
  • Date Completed:  JUNE 24, 2010
  • Project Location:  WORLDWIDE PLAZA BUILDING, UPTOWN AREA, BONIFACIO GLOBAL CITY (BGC), TAGUIG, MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  FEBRUARY 11, 2021
ANZ1

AUSTRALIA & NEW ZEALAND

PROJECTS

  • Project Location:  6778 AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 09, 2009

AUSTRALIA & NEW ZEALAND

PROJECTS

  • Project Location:  6778 AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 09, 2009
FLUOR1

FLUORDANIEL INC. PHILIPPINES

PROJECTS

  • Project Location:  ALABANG MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS, SECURITY AND ACCESS CONTROL
  • Date Start:
  • Date Completed:  SEPTEMBER 22, 2015

FLUORDANIEL INC. PHILIPPINES

PROJECTS

  • Project Location:  ALABANG MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS, SECURITY AND ACCESS CONTROL
  • Date Start:
  • Date Completed:  SEPTEMBER 22, 2015
Rockwell-Primaries1

ROCKWELL PRIMARIES

PROJECTS

  • Project Location:  SANTOLAN CUBAO Q.C.
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 25, 2015
  • Project Location:  EASTBAY RESIDENCES E SERVICE ROAD, SUCAT, MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 31, 2018

ROCKWELL PRIMARIES

PROJECTS

  • Project Location:  SANTOLAN CUBAO Q.C.
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 25, 2015
  • Project Location:  EASTBAY RESIDENCES E SERVICE ROAD, SUCAT, MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 31, 2018
TOTAL VENTURES1

TOTAL VENTURES, INC.

PROJECTS

  • Project Location:  TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 23, 2015
  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  FEBRUARY 16, 2016
  • Project Location:  22F-23F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 28, 2019
  • Project Location:  27F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 10, 2019

TOTAL VENTURES, INC.

PROJECTS

  • Project Location:  TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 23, 2015
  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  FEBRUARY 16, 2016
  • Project Location:  22F-23F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY CUBAO, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 28, 2019
  • Project Location:  27F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 10, 2019
KLAVENESS SHORE SERVICES1

KLAVENESS SHORE SERVICES, INC.

PROJECTS

  • Project Location:  5TH FLOORFIVE E-COM CENTER, HARBOR DRIVE, MOA COMPLEX, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  JUNE 19, 2015

KLAVENESS SHORE SERVICES, INC.

PROJECTS

  • Project Location:  5TH FLOORFIVE E-COM CENTER, HARBOR DRIVE, MOA COMPLEX, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  JUNE 19, 2015
P&G

PROCTER & GAMBLE INTERNATIONAL OPERATION

PROJECTS

  • Project Location:  10F-15F NET PARK BUILDING 4TH AVENUE, BONIFACIO GLOBAL CITY,TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  APRIL 08, 2015
  • Project Location:  10TH FLOOR, SEVEN/NEO BUILDING, 5TH AVENUE, BONIFACIO GLOBAL CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 17, 2020

PROCTER & GAMBLE INTERNATIONAL OPERATION

PROJECTS

  • Project Location:  10F-15F NET PARK BUILDING 4TH AVENUE, BONIFACIO GLOBAL CITY,TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  APRIL 08, 2015
  • Project Location:  10TH FLOOR, SEVEN/NEO BUILDING, 5TH AVENUE, BONIFACIO GLOBAL CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 17, 2020
ANTHEM

ANTHEM SOLUTIONS, INC.

PROJECTS

  • Project Location:  SILVER CITY 3, FRONTERAVERDE, ORTIGAS AVENUE, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2014

ANTHEM SOLUTIONS, INC.

PROJECTS

  • Project Location:  SILVER CITY 3, FRONTERAVERDE, ORTIGAS AVENUE, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2014
EMERSON1

EMERSON ELECTRIC (ASIA),LTD.

PROJECTS

  • Project Location:  CYBER SCAPE ALPHA, SAPPHIRE & GARNET ROADS, ORTIGAS CENTER, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS & FDAS PACKAGE
  • Date Start:
  • Date Completed:  AUGUST 13, 2013
  • Project Location:  9F, SM CYBERWEST AVE. BLDG., EDSA, COR. WESTAVE.& BULACAN ST. BRGY.BUNGAD, DILIMAN, QC
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 06, 2014
  • Project Location:  17TH – 21ST FLOOR CYBERSCAPE ALPHA BLDG. ORTIGAS PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 17, 2021

EMERSON ELECTRIC (ASIA),LTD.

PROJECTS

  • Project Location:  CYBER SCAPE ALPHA, SAPPHIRE & GARNET ROADS, ORTIGAS CENTER, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS & FDAS PACKAGE
  • Date Start:
  • Date Completed:  AUGUST 13, 2013
  • Project Location:  9F, SM CYBERWEST AVE. BLDG., EDSA, COR. WESTAVE.& BULACAN ST. BRGY.BUNGAD, DILIMAN, QC
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISIONFOR ELECTRICAL WORKS & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 06, 2014
  • Project Location:  17TH – 21ST FLOOR CYBERSCAPE ALPHA BLDG. ORTIGAS PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 17, 2021
OB MONTESSORI1

OB MONTESSORI

PROJECTS

  • Project Location:  CAMP AKELA, BRGY. SULSUGIN, ALFONSO, CAVITE CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR MAIN ELECTRICAL DISTRIBUTION SYSTEM
  • Date Start:
  • Date Completed:  MAY 20, 2014

OB MONTESSORI

PROJECTS

  • Project Location:  CAMP AKELA, BRGY. SULSUGIN, ALFONSO, CAVITE CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR MAIN ELECTRICAL DISTRIBUTION SYSTEM
  • Date Start:
  • Date Completed:  MAY 20, 2014
HSBC

HSBC ELECTRONIC DATA PROCESSING (PHILS) INC

PROJECTS

  • Project Location:  7F FILIVEST ONEBLDG., NORTHGATE CYBER ZONE ALABANG ZAPOTE RD., MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  DECEMBER 19, 2013

HSBC ELECTRONIC DATA PROCESSING (PHILS) INC

PROJECTS

  • Project Location:  7F FILIVEST ONEBLDG., NORTHGATE CYBER ZONE ALABANG ZAPOTE RD., MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  DECEMBER 19, 2013
BLOOMBERG1

BLOOMBERG PHILIPPINES

PROJECTS

  • Project Location:  11F AYALA TOWER1, AYALA TRIANGLE, AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 20, 2013

BLOOMBERG PHILIPPINES

PROJECTS

  • Project Location:  11F AYALA TOWER1, AYALA TRIANGLE, AYALA AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 20, 2013
MACQUARIE

MACQUARIE OFFSHORE SERVICES PTY. LTD. PHILS.

PROJECTS

  • Project Location:  14F & 15F, TOWER2, THE ENTERPRISE, AYALA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 19, 2012
  • Project Location:  32F-33F, TOWER1, THE ENTERPRISE, AYALA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JULY 03, 2013
  • Project Location:  LEVEL 29 TOWER 1, THE ENTERPRISE CENTER AYALA AVE. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 21, 2022

MACQUARIE OFFSHORE SERVICES PTY. LTD. PHILS.

PROJECTS

  • Project Location:  14F & 15F, TOWER2, THE ENTERPRISE, AYALA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  SEPTEMBER 19, 2012
  • Project Location:  32F-33F, TOWER1, THE ENTERPRISE, AYALA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  JULY 03, 2013
  • Project Location:  LEVEL 29 TOWER 1, THE ENTERPRISE CENTER AYALA AVE. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 21, 2022
CITI1

CITI GROUP BUSINESS PROCESS SOLUTIONS PTE. LTD.

PROJECTS

  • Project Location:  22F, NETLIMABLDG., 5TH AVE., COR.26THST. COR. E SQUARE, CRESCENTPARK WEST, BGC,TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 24, 2013

CITI GROUP BUSINESS PROCESS SOLUTIONS PTE. LTD.

PROJECTS

  • Project Location:  22F, NETLIMABLDG., 5TH AVE., COR.26THST. COR. E SQUARE, CRESCENTPARK WEST, BGC,TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JANUARY 24, 2013
ADP1

ADP (PHILIPPINES) INC.

PROJECTS

  • Project Location:  6F-11F, GLORIETT A 1&2, BPO 2, AYALA CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  DECEMBER 14, 2012

ADP (PHILIPPINES) INC.

PROJECTS

  • Project Location:  6F-11F, GLORIETT A 1&2, BPO 2, AYALA CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL & FDAS PACKAGE
  • Date Start:
  • Date Completed:  DECEMBER 14, 2012
PHILAM2

THE PHILIPPINE-AMERICAN LIFE

PROJECTS

  • Project Location:  15F-18F,NET LIMA BLDG., 5THAVE., COR. 26THST.COR. ESQUARE, CRESCENTPARK WEST, BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 30, 2012

THE PHILIPPINE-AMERICAN LIFE

PROJECTS

  • Project Location:  15F-18F,NET LIMA BLDG., 5THAVE., COR. 26THST.COR. ESQUARE, CRESCENTPARK WEST, BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  OCTOBER 30, 2012
MDC1

MAKATI DEVELOPMENT CORPORATION

PROJECTS

  • Project Location:  BRGY. CARMONA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS UNDERGROUND DISTRIBUTION
  • Date Start:
  • Date Completed:  OCTOBER 04, 2012

MAKATI DEVELOPMENT CORPORATION

PROJECTS

  • Project Location:  BRGY. CARMONA, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS UNDERGROUND DISTRIBUTION
  • Date Start:
  • Date Completed:  OCTOBER 04, 2012
LBL2

LBL PRIME PROPERTIES INC.

PROJECTS

  • Project Location:  MANGGAHAN LIGHT INDUSTRIAL PARK, AMANG RODRIGUEZ AVE., MANGGAHAN, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 27, 2019

LBL PRIME PROPERTIES INC.

PROJECTS

  • Project Location:  MANGGAHAN LIGHT INDUSTRIAL PARK, AMANG RODRIGUEZ AVE., MANGGAHAN, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 27, 2019
TELKHA2

TELKHA NETWORK INC

PROJECTS

  • Project Location:  10TH FLOOR, HIGH STREET SOUTH CORPORATE PLAZA TOWER 2 FORUNITS 1001,1002,1003,1016,1017,1018 AND 1019, 9TH AND 26TH STREET BONIFACIO GLOBAL CITY, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 22, 2019
  • Project Location:  HSS TOWER 2, BONIFACIO GLOBAL CITY, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 05, 2020

TELKHA NETWORK INC

PROJECTS

  • Project Location:  10TH FLOOR, HIGH STREET SOUTH CORPORATE PLAZA TOWER 2 FORUNITS 1001,1002,1003,1016,1017,1018 AND 1019, 9TH AND 26TH STREET BONIFACIO GLOBAL CITY, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 22, 2019
  • Project Location:  HSS TOWER 2, BONIFACIO GLOBAL CITY, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 05, 2020
CONCENTRIX1

CONCENTRIX

PROJECTS

  • Project Location:  GF, 15TH TO 25TH FLOORS,, AYALA NORTH EXCHANGE TOWER 2, MAKATI CITY
  • Floor Area:
  • Scope:  ELECTRICAL WORKS PACKAGE INCLUDING FDAS
  • Date Start:
  • Date Completed:  MAY 28,2018
  • Project Location:  23RD FLOOR, CITY GATE TOWER 2, AYALA AVE. COR. SALCEDO ST., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 4, 2019
  • Project Location:  CNX-ANE 14TH FLOOR
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 19, 2019
  • Project Location:  CEBU EXCHANGE TOWER, SALINAS DRIVE, CEBU CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 2020
  • Project Location:  20F THREE CYBERPOD NORTH, ETON CENTRIS, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 03, 2020
  • Project Location:  8TH TO 11TH FLOOR, MEGAMALL BLDG C EDSA COR. JULIA VARGAS AVENUE MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 25, 2020

CONCENTRIX

PROJECTS

  • Project Location:  CEBU EXCHANGE TOWER, SALINAS DRIVE, CEBU CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 2020
  • Project Location:  20F THREE CYBERPOD NORTH, ETON CENTRIS, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 03, 2020
  • Project Location:  8TH TO 11TH FLOOR, MEGAMALL BLDG C EDSA COR. JULIA VARGAS AVENUE MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 25, 2020
  • Project Location:  CNX-ANE 14TH FLOOR
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 19, 2019
  • Project Location:  23RD FLOOR, CITY GATE TOWER 2, AYALA AVE. COR. SALCEDO ST., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 4, 2019
  • Project Location:  GF, 15TH TO 25TH FLOORS,, AYALA NORTH EXCHANGE TOWER 2, MAKATI CITY
  • Floor Area:
  • Scope:  ELECTRICAL WORKS PACKAGE INCLUDING FDAS
  • Date Start:
  • Date Completed:  MAY 28,2018
EEBLACK2

E.E. BLACK LTD

PROJECTS

  • Project Location:  MALL OF ASIA COMPLEX, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALLOF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS (14
    FLOOR)
  • Date Start:
  • Date Completed:  MAY 31, 2016
  • Project Location:  CEBU CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 16, 2016
  • Project Location:  2ND FLR BLDG OAYALA TECHNOHUB COMM. DILIMAN QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 04, 2017
  • Project Location:  UP-TOWNTECHNOHUB QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 09, 2017
  • Project Location:  BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION INCLUDING TOOLS AND EQUIPMENT FOR ELECTRICAL AND STRUCTURE CABLING WORKS
  • Date Start:
  • Date Completed:  JANUARY 19, 2018
  • Project Location:  BGC, TAGUIG
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 20,2018
  • Project Location:  MANILA AMERICAN CEMETERY, FORT BONIFACIO, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 16, 2018
  • Project Location:  25TH FLOOR, 25/7 BUILDING, 25TH ST. COR. 7TH AVE., BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 19, 2019
  • Project Location:  GF, 18TH TO 20TH AND 27TH FLOOR, B.G.C. CORPORATE CENTER 2, 5TH AVENUE COR.30TH STREET BONIFACIO GLOBAL CITY, TAGUIG, PHILIPPINES
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 14, 2020
  • Project Location:  LINKSY BUILDING 2, NORTH NATIONAL HIGHWAY, BANTAYAN, DUMAGUETE CITY, NEGROS ORIENTAL
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MAY 25, 2022

E.E. BLACK LTD

PROJECTS

  • Project Location:  LINKSY BUILDING 2, NORTH NATIONAL HIGHWAY, BANTAYAN, DUMAGUETE CITY, NEGROS ORIENTAL
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MAY 25, 2022
  • Project Location:  GF, 18TH TO 20TH AND 27TH FLOOR, B.G.C. CORPORATE CENTER 2, 5TH AVENUE COR.30TH STREET BONIFACIO GLOBAL CITY, TAGUIG, PHILIPPINES
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 14, 2020
  • Project Location:  25TH FLOOR, 25/7 BUILDING, 25TH ST. COR. 7TH AVE., BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 19, 2019
  • Project Location:  MANILA AMERICAN CEMETERY, FORT BONIFACIO, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 16, 2018
  • Project Location:  BGC, TAGUIG
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 20,2018
  • Project Location:  BGC, TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION INCLUDING TOOLS AND EQUIPMENT FOR ELECTRICAL AND STRUCTURE CABLING WORKS
  • Date Start:
  • Date Completed:  JANUARY 19, 2018
  • Project Location:  UP-TOWNTECHNOHUB QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 09, 2017
  • Project Location:  2ND FLR BLDG OAYALA TECHNOHUB COMM. DILIMAN QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 04, 2017
  • Project Location:  CEBU CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 16, 2016
  • Project Location:  MALL OF ASIA COMPLEX, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALLOF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS (14
    FLOOR)
  • Date Start:
  • Date Completed:  MAY 31, 2016
SANTOS KNIGHT FRANK1

SANTOS KNIGHT FRANK

PROJECTS

  • Project Location:  7F DOUBLE DRAGON WEST TOWER, MACAPAGAL AVENUE, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2019

SANTOS KNIGHT FRANK

PROJECTS

  • Project Location:  7F DOUBLE DRAGON WEST TOWER, MACAPAGAL AVENUE, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 13, 2019
THOMSON1

THOMSON REUTERS CORPORATION PTE., LTD.–PHILIPPINE BRANCH

PROJECTS

  • Project Location:  THOMSON REUTERS CORORATION PTE.LTD PHILIPPINES BRACH OFFICE FIT OUT 10F 18/20 BLDG. UPPER MCKINLEY ROAD HILL TOWN CENTER CYBERPARK, BRGY.PINAGSAM BCG TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 24, 2021
  • Project Location:  14TH FLOOR IN WORLD COMMERCE PLACE, 11TH AVENUE CORNER 36THSTREET, UPTOWN BONIFACIO, BONIFACIO GLOBAL CITY (BGC), TAGUIG
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 7, 2019

THOMSON REUTERS CORPORATION PTE., LTD.–PHILIPPINE BRANCH

PROJECTS

  • Project Location:  THOMSON REUTERS CORORATION PTE.LTD PHILIPPINES BRACH OFFICE FIT OUT 10F 18/20 BLDG. UPPER MCKINLEY ROAD HILL TOWN CENTER CYBERPARK, BRGY.PINAGSAM BCG TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  AUGUST 24, 2021
  • Project Location:  14TH FLOOR IN WORLD COMMERCE PLACE, 11TH AVENUE CORNER 36THSTREET, UPTOWN BONIFACIO, BONIFACIO GLOBAL CITY (BGC), TAGUIG
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 7, 2019
PSE1

PHILIPPINE STOCK EXCHANGE

PROJECTS

  • Project Location:  PSE PLAZA, AYALA TRIANGLE, AYALA AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 7, 2019

PHILIPPINE STOCK EXCHANGE

PROJECTS

  • Project Location:  PSE PLAZA, AYALA TRIANGLE, AYALA AVENUE, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  NOVEMBER 7, 2019
TOMELEKT

TOM'ELEKT

PROJECTS

  • Project Location:  PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 22, 2019

TOM'ELEKT

PROJECTS

  • Project Location:  PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Date Start:
  • Date Completed:  JULY 22, 2019
MAXIBUILD

MAXIBUILD, INC.

PROJECTS

  • Project Location:  65 CALLE INDUSTRIA, BAGUMABYAN QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 24, 2020
  • Project Location:  5FZUELLIG, MAKATI AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 06,2019
  • Project Location:  #65 CALLE INDUSTRIA, BAGUMBAYAN, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 28, 2017

MAXIBUILD, INC.

PROJECTS

  • Project Location:  65 CALLE INDUSTRIA, BAGUMABYAN QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JULY 24, 2020
  • Project Location:  5FZUELLIG, MAKATI AVE., MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  FEBRUARY 06,2019
  • Project Location:  #65 CALLE INDUSTRIA, BAGUMBAYAN, QUEZON CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 28, 2017
JLL2

JONES LANG LASALLE SSC, INC.

PROJECTS

  • Project Location:  WORLDWIDE PLAZA BUILDING, UPTOWN AREA, BONIFACIO GLOBAL CITY (BGC), TAGUIG, MANILA
  • Floor Area:  880 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:  WORJANUARY 16, 2023
  • Date Completed:  JUNE 30, 2023
  • Project Location:  SKYTECH IT PARK, MCARTHUR HIGHWAY BRGY. CAMANCHILLES, MABALACAT, PAMPANGA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 29, 2019
  • Project Location:  19FNEX TOWER,6786 AYALA AVE. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 13, 2018
  • Project Location:  MERALCO AVENUE, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 21, 2017

JONES LANG LASALLE SSC, INC.

PROJECTS

  • Project Location:  WORLDWIDE PLAZA BUILDING, UPTOWN AREA, BONIFACIO GLOBAL CITY (BGC), TAGUIG, MANILA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 2020
  • Project Location:  SKYTECH IT PARK, MCARTHUR HIGHWAY BRGY. CAMANCHILLES, MABALACAT, PAMPANGA
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 29, 2019
  • Project Location:  19FNEX TOWER,6786 AYALA AVE. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 13, 2018
  • Project Location:  MERALCO AVENUE, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 21, 2017
CELINEBORJA1

CELINE BORJA ARCHITECTS

PROJECTS

  • Project Location:  MARIKINA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 01, 2018

CELINE BORJA ARCHITECTS

PROJECTS

  • Project Location:  MARIKINA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  OCTOBER 01, 2018
STANDARD GROUP1

STANDARD HOSPITALITY GROUP

PROJECTS

  • Project Location:  MARIKINA-INFANTA HIGHWAY, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 19, 2018

STANDARD HOSPITALITY GROUP

PROJECTS

  • Project Location:  MARIKINA-INFANTA HIGHWAY, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 19, 2018
PHSCC1

PIONEER HIGHLANDS SOUTH CONDOMINIUM CORPORATION

PROJECTS

  • Project Location:  UG GLOBE TELECOM PLAZA PIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area: 2,550 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start: JUNE 10, 2022
  • Date Completed:  JANUARY 15, 2023
  • Project Location:  UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 17, 2018

PIONEER HIGHLANDS SOUTH CONDOMINIUM CORPORATION

PROJECTS

  • Project Location:  UG GLOBE TELECOM PLAZA PIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  DECEMBER 2022
  • Project Location:  UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 17, 2018
RDPA1

RDPA

PROJECTS

  • Project Location:  UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENTS FOR THERMAL SCANNING
  • Date Start:
  • Date Completed:  SEPTEMBER 11, 2018

RDPA

PROJECTS

  • Project Location:  UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Floor Area:
  • Scope:  SUPPLY OF LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENTS FOR THERMAL SCANNING
  • Date Start:
  • Date Completed:  SEPTEMBER 11, 2018
THE ROCKWELL CLUB2

THE ROCKWELL LEISURE CLUB INC.

PROJECTS

  • Project Location:  ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 15, 2017

THE ROCKWELL LEISURE CLUB INC.

PROJECTS

  • Project Location:  ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  SEPTEMBER 15, 2017
JCL

JCL INTERNATIONAL

PROJECTS

  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 23, 2017

JCL INTERNATIONAL

PROJECTS

  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 23, 2017
CHESNEYVALE1

CHESNEYVALE GROUP

PROJECTS

  • Project Location:  7TH FLR 8 ROCKWELL BLDG. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 15, 2017

CHESNEYVALE GROUP

PROJECTS

  • Project Location:  7TH FLR 8 ROCKWELL BLDG. MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 15, 2017
SHINRYO1

SHINRYO PHILIPPINES

PROJECTS

  • Project Location:  1 ASEANA AVENUE ENTERTAINMENT CITY, TAMBO PARAÑAQUE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 10, 2020
  • Project Location:  W CITYTOWER 7TH AVE. BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 16, 2017
  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, TOOLS AND EQUIPMENTIN CLUDING ENGINEERING SUPERVISION, TESTING AND COMMISSIONING FOR THE COMPLETEELECTRICAL INSTALLATION OF MEDIUM AND LOW VOLTAGE EQUIPMENTS AND DISTRIBUTION(17TH FLOOR)
  • Date Start:
  • Date Completed:  SEPTEMBER 13, 2016

SHINRYO PHILIPPINES

PROJECTS

  • Project Location:  1 ASEANA AVENUE ENTERTAINMENT CITY, TAMBO PARAÑAQUE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 10, 2020
  • Project Location:  W CITYTOWER 7TH AVE. BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 16, 2017
  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, TOOLS AND EQUIPMENTIN CLUDING ENGINEERING SUPERVISION, TESTING AND COMMISSIONING FOR THE COMPLETEELECTRICAL INSTALLATION OF MEDIUM AND LOW VOLTAGE EQUIPMENTS AND DISTRIBUTION(17TH FLOOR)
  • Date Start:
  • Date Completed:  SEPTEMBER 13, 2016
DSM MANILA LLP1

DSM MANILA LLP

PROJECTS

  • Project Location:   16F TOWER 2 THE ENTERPRISE CENTER 6766 AYALA MAKITI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 15, 2017

DSM MANILA LLP

PROJECTS

  • Project Location:   16F TOWER 2 THE ENTERPRISE CENTER 6766 AYALA MAKITI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JUNE 15, 2017
LJ INDUSTRIAL FABRICATION​1

LJ INDUSTRIAL FABRICATION

PROJECTS

  • Project Location:  EDSA EXT, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 17, 2017
  • Project Location:  CEBU EXCHANGE TOWER, SALINAS DRIVE, CEBU CITY
  • Floor Area:  4,865.95 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:  JANUARY 30, 2024
  • Date Completed:  APRIL 29, 2024

LJ INDUSTRIAL FABRICATION

PROJECTS

  • Project Location:  EDSA EXT, PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  APRIL 17, 2017
MSERV1

MERALCO MSERVE ENERGY SERVICES COMPANY

PROJECTS

  • Project Location:  MARIKINA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 08, 2017
  • Project Location:  ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 14, 2016

MERALCO MSERVE ENERGY SERVICES COMPANY

PROJECTS

  • Project Location:  MARIKINA CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  MARCH 08, 2017
  • Project Location:  ORTIGAS, PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  JANUARY 14, 2016
UNILEVER1

UNILEVER PHILIPPINES

PROJECTS

  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS ( 7TH TO 11TH FLOOR )
  • Date Start:
  • Date Completed:  APRIL 18, 2016

UNILEVER PHILIPPINES

PROJECTS

  • Project Location:  BGC TAGUIG CITY
  • Floor Area:
  • Scope:  SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS ( 7TH TO 11TH FLOOR )
  • Date Start:
  • Date Completed:  APRIL 18, 2016
VERTIV1

VERTIV

PROJECTS

  • Project Location:  SAN AGUSTIN TIAONG QUEZON
  • Floor Area:  1,056 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:  AUGUST 21, 2022
  • Date Completed:  AUGUST 18, 2023

VERTIV

PROJECTS

  • Project Location:  SAN AGUSTIN TIAONG QUEZON
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  DECEMBER 2022
JCVA1

JCV & ASSOCIATES

PROJECTS

  • Project Location:  2723 SABIO ST. BRGY. BANGKAL MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  JUNE 25, 2022

JCV & ASSOCIATES

PROJECTS

  • Project Location:  2723 SABIO ST. BRGY. BANGKAL MAKATI CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  JUNE 25, 2022
EMPOL

EM-POL CORPORATION

PROJECTS

  • Project Location:  SUCAT, PARAÑAQUE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  MAY 25, 2022

EM-POL CORPORATION

PROJECTS

  • Project Location:  SUCAT, PARAÑAQUE
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  MAY 25, 2022
NCH1

NCH CUSTOMER SUPPORT SERVICES, INC.

PROJECTS

  • Project Location:  NCH DD WEST TOWER 6F OFFICE FIT OUT PROJECT 6F TOWER 3, DOUBLE DRAGON PLAZA EDSA EXT.COR.MACAPAGL AVE. BRGY.076 PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  AUGUST 24, 2021

NCH CUSTOMER SUPPORT SERVICES, INC.

PROJECTS

  • Project Location:  NCH DD WEST TOWER 6F OFFICE FIT OUT PROJECT 6F TOWER 3, DOUBLE DRAGON PLAZA EDSA EXT.COR.MACAPAGL AVE. BRGY.076 PASAY CITY
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  AUGUST 24, 2021
BEYOND INNOVATIONS1

BEYOND INNOVATIONS

PROJECTS

  • Project Location:  7TH, 8TH, 9TH FLOOR TOWER 4, ALLIANCE GLOBAL TOWER 36TH ST., COR 11TH AVE., BONIFACIO GLOBAL CITY TAGUIG
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  FEBRUARY 13, 2021

BEYOND INNOVATIONS

PROJECTS

  • Project Location:  7TH, 8TH, 9TH FLOOR TOWER 4, ALLIANCE GLOBAL TOWER 36TH ST., COR 11TH AVE., BONIFACIO GLOBAL CITY TAGUIG
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT.
  • Date Start:
  • Date Completed:  FEBRUARY 13, 2021
united electrical1

UNITED ELECTRICAL SPECIALISTS, INC

PROJECTS

  • Project Location:  C-5 ROAD, BARRIO UGONG 9999 PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MISCELLANEOUS AND CONSUMABLES LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 06, 2020

UNITED ELECTRICAL SPECIALISTS, INC

PROJECTS

  • Project Location:  C-5 ROAD, BARRIO UGONG 9999 PASIG CITY
  • Floor Area:
  • Scope:  SUPPLY OF MISCELLANEOUS AND CONSUMABLES LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  NOVEMBER 06, 2020
CBRE1

CBRE PHILIPPINES

PROJECTS

  • Project Location:  AYALA TRIANGLE GARDEN TOWER 2, MAKATI, METRO MANILA PHILIPPINES
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 04, 2020

CBRE PHILIPPINES

PROJECTS

  • Project Location:  AYALA TRIANGLE GARDEN TOWER 2, MAKATI, METRO MANILA PHILIPPINES
  • Floor Area:
  • Scope:  SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:
  • Date Completed:  AUGUST 04, 2020
SATORI1

SATORI PROPERTY ONE, INC.

PROJECTS

  • Project Location:  60 DON CELSO ST., TUASON AVE,. ANTIPOLO, RIZAL
  • Floor Area:  4,400 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR & SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:  JUNE 2, 2023
  • Date Completed:  JUNE 30, 2024

FLUORDANIEL INC. PHILIPPINES

PROJECTS

  • Project Location:  ALABANG MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS, SECURITY AND ACCESS CONTROL
  • Date Start:
  • Date Completed:  SEPTEMBER 22, 2015
NEW PORT WORLD RESORTS1

NEWPORT WORLD RESORTS FOUNDATION INC.

PROJECTS

  • Project Location:  LAWTON AVE., TAGUIG CITY
  • Floor Area:  6,838 sq. mt.
  • Scope:  SUPPLY OF MATERIALS, LABOR & SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Date Start:  JULY 3, 2023
  • Date Completed:  AUGUST 31, 2024

FLUORDANIEL INC. PHILIPPINES

PROJECTS

  • Project Location:  ALABANG MUNTINLUPA CITY
  • Floor Area:
  • Scope:  SUPPLY & SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS, SECURITY AND ACCESS CONTROL
  • Date Start:
  • Date Completed:  SEPTEMBER 22, 2015

Power Circle International, Inc.