LBL PRIME PROPERTIES INC.

  • Project Name: CCPI OFFICE FIT OUT
  • Project Location: MANGGAHAN LIGHT INDUSTRIAL PARK, AMANG RODRIGUEZ AVE., MANGGAHAN, PASIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 27, 2019

TELKHA NETWORK INC

  • Project Name: UNI PRESIDENT
  • Project Location: 10TH FLOOR, HIGH STREET SOUTH CORPORATE PLAZA TOWER 2 FORUNITS 1001,1002,1003,1016,1017,1018 AND 1019, 9TH AND 26TH STREET BONIFACIO GLOBAL CITY, TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 22, 2019

CONCENTRIX

  • Project Name: CONCENTRIX 14TH FLOOR
  • Project Location: CNX-ANE 14THFLOOR
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 19, 2019

E.E. BLACK LTD.

  • Project Name: HPE PROJECT
  • Project Location: 25TH FLOOR, 25/7 BUILDING, 25TH ST. COR. 7TH AVE., BGC, TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 19, 2019

SANTOS KNIGHT FRANK

  • Project Name: NCH DDWEST TOWER OFFICEFIT OUT PROJECT
  • Project Location: 7F DOUBLE DRAGON WEST TOWER, MACAPAGAL AVENUE, PASAYCITY
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: NOVEMBER 13, 2019

THOMSON REUTERS CORPORATION PTE., LTD.–PHILIPPINE BRANCH

  • Project Name: THOMSON REUTERS OFFICE FIT-OUT
  • Project Location: 14TH FLOOR IN WORLD COMMERCE PLACE, 11TH AVENUE CORNER 36THSTREET, UPTOWN BONIFACIO, BONIFACIO GLOBAL CITY (BGC), TAGUIG
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: NOVEMBER 7, 2019

PHILIPPINE STOCK EXCHANGE

  • Project Name: PSE AYALA RENOVATION PROJECT
  • Project Location: PSE PLAZA, AYALA TRIANGLE, AYALA AVENUE, MAKATI CITY
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: NOVEMBER 7, 2019

TOM'ELEKT

  • Project Name: MARRIOT GRAND BALLROOM
  • Project Location: PASAY CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 22, 2019

TOTAL VENTURES, INC.

  • Project Name: DPI
  • Project Location: 27F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 10,2019

CONCENTRIX

  • Project Name: CONCENTRIX 23RD FLOOR
  • Project Location: 23RD FLOOR, CITY GATE TOWER 2, AYALA AVE. COR. SALCEDO ST., MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 4, 2019

DTSI, INC.

  • Project Name: AMADEUS
  • Project Location: 19TH FLOOR, WORLD COMMERCE PLACE
  • Scope: SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Completion Year: JUNE 21, 2019

DTSI, INC.

  • Project Name: NAVITAIRE
  • Project Location: 18TH FLOOR, WORLD COMMERCE PLACE
  • Scope: SUPPLY OF MATERIALS & LABOR FOR ELECTRICAL WORKS
  • Completion Year: JUNE 21, 2019

BDO

  • Project Name: 32ND FLOOR CITIBANK TOWER
  • Project Location: 32ND FLOOR CITIBANK TOWER, PASEO DE ROXAS, MAKATI AVE., MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MAY 31,2019

DTSI, INC.

  • Project Name: IQOR ILOILO 5F
  • Project Location: 5F 2 TECHNO BLDG. ILOILO CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MARCH 15,2019

DTSI, INC.

  • Project Name: IQOR DAVAO 4F-6F
  • Project Location: 2 TECHNO BLDG., FINANCE CENTER 4F-6F, DAVAO CTIY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MARCH 15,2019

DTSI, INC.

  • Project Name: 8F & 9F 24/7IN TOUCH
  • Project Location: 8-9TH FLOOR GEN. MCARTHUR AVE. ARANETA CENTER CUBAO, QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MARCH 12, 2019

TOTAL VENTURES, INC.

  • Project Name: DPI
  • Project Location: 22F-23F ECOPRIME TOWER, 32ND ST. COR. 9TH AVE., BGC, TAGUIG CITY CUBAO, QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: FEBRUARY 28,2019

MAXIBUILD, INC.

  • Project Name: FINASTRA
  • Project Location: 5FZUELLIG, MAKATI AVE., MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: FEBRUARY 06,2019

JLL, INC.

  • Project Name: UBER CLARK
  • Project Location: SKYTECH IT PARK, MCARTHUR HIGHWAY BRGY. CAMANCHILLES, MABALACAT, PAMPANGA
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JANUARY 29,2019

DTSI, INC.

  • Project Name: IQOR CLARK 6F
  • Project Location: 6F SM CLARK, MA ROXAS AVE. ANGELES CITY, PAMPANGA
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JANUARY 21,2019

JLL, INC.

  • Project Name: NEW JLL MANILA HEAD OFFICE FIT-OUT
  • Project Location: 19FNEX TOWER,6786 AYALA AVE. MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: DECEMBER 13,2018

E.E. BLACK LTD.​

  • Project Name: MANILA AMERICAN CEMETERY
  • Project Location: MANILA AMERICAN CEMETERY, FORT BONIFACIO, TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 16,2018

DTSI, INC.

  • Project Name: REED ELSEVIER 3FUP-AYALA LAND TECHNOHUB BLDG. P OFFICE FIT-OUT
  • Project Location: 3F BLDG P, UP- AYALA LAND TECHNOHUB COMMONWEALTH AVE., QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 12, 2018

DTSI, INC.

  • Project Name: AMAYSIM
  • Project Location: 10TH & 11TH FLOOR AYALA NORTH EXCHANGE TOWER 2, AYALA AVE., COR. SALCEDO ST. LEGASPI VILLAGE, MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: OCTOBER 26, 2018

DTSI, INC.

  • Project Name: 24/7 INTOUCH 12FCUBAO
  • Project Location: 12F CYBERPARK TOWER 1, AGUINALDO AVE. CENTER, CUBAO, QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: OCTOBER22, 2018

CELINE BORJA ARCHITECTS

  • Project Name: PROPOSED THREE STOREY RESIDENCE
  • Project Location: MARIKINA CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: OCTOBER 01,2018

E.E. BLACK LTD.​

  • Project Name: NOKIA THE CURVE
  • Project Location: BGC, TAGUIG
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 20,2018

STANDARD HOSPITALITY GROUP

  • Project Name: YABU–THE HOUSE OF KATSU–FELIZ
  • Project Location: MARIKINA-INFANTA HIGHWAY, PASIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 19,2018

PIONEER HIGHLANDS SOUTH CONDOMINIUM CORPORATION

  • Project Name: PIONEER HIGHLANDS SOUTH
  • Project Location: UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 17,2018

RDPA

  • Project Name: PIONEER HIGHLANDS
  • Project Location: UG GLOBE TELECOM PLAZAPIONEER HIGHLANDS SOUTH PIONEER COR. MADISON ST., MANDALUYONG CITY
  • Scope: SUPPLY OF LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENTS FOR THERMAL SCANNING
  • Completion Year: SEPTEMBER 11,2018

BDO

  • Project Name: CITIBANK TOWER 9TH,10TH,11TH,12TH & 14TH FLOORS
  • Project Location: PASEO DEROXAS, MAKATI AVE., MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 07,2018

BDO

  • Project Name: BDO GREENHILLS – ROOSEVELT DATA CENTER EXPANSION
  • Project Location: 2ND FLOOR BUILDING1 – ROOSEVELT
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 31, 2018

DTSI INC.

  • Project Name: YOUNG LIVING
  • Project Location: TWENTYFIVE SEVENMCKINLEY, 7TH AVE., COR. 25THY,BGC, TAGUIGCITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 13, 2018

ROCKWELL LAND CORPORATION

  • Project Name: INSTALLATION AND DISMANTLING OF OSM CHRISTMAS DÉCOR
  • Project Location: ROCKWELL CENTER, MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 08, 2018

ROCKWELL PRIMARIES

  • Project Name: EAST BAY RESIDENCES
  • Project Location: EASTBAY RESIDENCES E SERVICE ROAD, SUCAT, MUNTINLUPA CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 31, 2018

DTSI INC.

  • Project Name: IQOR ILOILO
  • Project Location: FESTIVEMALL SM ILOILO, MANDURIAO, ILOILOCITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 28,2018

DTSI INC.

  • Project Name: JP MORGAN–AGT INCUBATION SPACE
  • Project Location: ALLIANCE GLOBAL TOWER, BGC, TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JULY 04,2018

CONCENTRIX

  • Project Name: CONVERGYS OFFICE FIT-OUT
  • Project Location: GF, 15TH TO 25TH FLOORS,, AYALA NORTH EXCHANGE TOWER 2, MAKATI CITY
  • Scope: ELECTRICAL WORKS PACKAGE INCUDING FDAS
  • Completion Year: MAY 28,2018

THE ROCKWELL LAND

  • Project Name: PPMEX RETAIL OFFICE
  • Project Location: 4F POWER PLANT MALL, ROCKWELL CENTER, MAKATI CTY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: APRIL 4,2018

E.E.BLACK LTD

  • Project Name: FIRMENICH PHILIPPINES (FIRPHIL) OFFICE INTERIOR FIT OUTPROJECT
  • Project Location: BGC, TAGUIGCITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION INCLUDING TOOLS AND EQUIPMENT FOR ELECTRICAL AND STRUCTURE CABLING WORKS
  • Completion Year: JANUARY 19, 2018

E.E. BLACK LTD.​

  • Project Name: NOKIA TECHNOLOGY CENTER PHIL.INC BLDG. I
  • Project Location: UP-TOWNTECHNOHUB QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 09, 2017

DTSI INC.

  • Project Name: FACTSET PROJECT
  • Project Location: COMMERCE & INDUSTRY PLAZA, 1631,1030 CAMPUS AVENUE, TAGUIG, 1634 METRO MANILA
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 08, 2017

JONES LANG LASALLEPHIL INC

  • Project Name: ALLEGIS MANILA OFFICE RENOVATION
  • Project Location: MERALCO AVENUE, PASIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 21, 2017

ROCKWELLLAND CORP.

  • Project Name: AMBERLIGHTS INSTALLATION & DISMANTLING 2017
  • Project Location: ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 15, 2017

THE ROCKWELL LEISURE CLUB INC.

  • Project Name: ATLETICA PROJECT
  • Project Location: ESTRELLAST.,COR. ROCKWELL DRIVE ROCKWELL CENTER, MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: SEPTEMBER 15, 2017

DTSI INC

  • Project Name: SYCIP PROJECT
  • Project Location: SYCIP LAW CENTER, PASEO DE ROXAS, MAKATI CITY
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: SEPTEMBER 08,2017

JCL INTERNATIONAL

  • Project Name: PSEOFFICEFIT-OUT
  • Project Location: BGC TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 23,2017

CHESNEYVALE GROUP

  • Project Name: PSEOFFICEFIT-OUT
  • Project Location: 7TH FLR 8 ROCKWELL BLDG. MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 15, 2017

E.E. BLACK LTD.​

  • Project Name: NOKIA BLDG-O EXPANSION
  • Project Location: 2ND FLR BLDG OAYALA TECHNOHUB COMM. DILIMAN QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: AUGUST 04, 2017

MAXIBUILD INC.

  • Project Name: LBL TOWER INTERIORFIT-OUT
  • Project Location: #65 CALLE INDUSTRIA, BAGUMBAYAN, QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JUNE 28, 2017

SHINRYO PHILIPPINES

  • Project Name: WCC GOOGLE BACKBONE
  • Project Location: W CITYTOWER 7TH AVE. BGC TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JUNE 16,2017

DSM MANILA LLP

  • Project Name: DSM MANILA
  • Project Location: 16F TOWER 2 THE ENTERPRISE CENTER 6766 AYALA MAKITI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JUNE 15, 2017

DTSI INC.

  • Project Name: REPUBLIC CEMENT
  • Project Location: MAKATI CITY, METRO MANILA
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MAY 26, 2017

DTSI INC.

  • Project Name: IQOR STA. ROSA
  • Project Location: 7TH & 8TH FLOOR SM CITY STA. ROSA LAGUNA
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: APRIL 29, 2017

LJ INDUSTRIAL FABRICATION

  • Project Name: NEXGEN TOWER
  • Project Location: EDSA EXT, PASAY CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: APRIL 17, 2017

DTSI INC.

  • Project Name: QUANTRICS TAYTAY
  • Project Location: 2ND & 3RD FLOOR SM TAYTAY, RIZAL
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: APRIL 06, 2017

MERALCO MSERVE ENERGY SERVICES COMPANY

  • Project Name: PROJECT HOMERUN
  • Project Location: MARIKINA CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: MARCH 08, 2017

BDO GERCON

  • Project Name: BDO GERCON-UPGRADE FITOUT
  • Project Location: GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: FEBRUARY 21, 2017

BDO GERCON

  • Project Name: BDO GERCON-BACKBONE
  • Project Location: GERCON PLAZA BLDG. MAKATI AVENUE MAKATI CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: FEBRUARY 20, 2017

DTSI INC.

  • Project Name: 24/7 INTOUCH 10-11TH FLOOR
  • Project Location: ARANETA CUBAO, QUEZON CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: FEBRUARY 01, 2017

E.E. BLACK LTD.​

  • Project Name: GOOGLE PHILIPPINES CEBU AUXILILIARY WORKS
  • Project Location: CEBU CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: NOVEMBER 16, 2016

SHINRYO PHILIPPINES

  • Project Name: MANILA CSC 34TH ST
  • Project Location: BGC TAGUIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, TOOLS AND EQUIPMENTIN CLUDING ENGINEERING SUPERVISION, TESTING AND COMMISSIONING FOR THE COMPLETEELECTRICAL INSTALLATION OF MEDIUM AND LOW VOLTAGE EQUIPMENTS AND DISTRIBUTION(17TH FLOOR)
  • Completion Year: SEPTEMBER 13, 2016

DIVERSIFIED TECHNOLOGY SOLUTIONS INT'L., INC.

  • Project Name: IGT ALABANG
  • Project Location: 4HT FLOOR ATC BPO I MADRIGAL AVE., ALABANG
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: JULY 29, 2016

DIVERSIFIED TECHNOLOGY SOLUTIONS INT'L., INC.

  • Project Name: QUANTRICS TAYTAY
  • Project Location: GF & 4TH FLOOR SM TAYTAY, RIZAL
  • Scope: SUPPLY AND INSTALL OF MATERIALS, LABOR AND SUPERVISION FOR ELECTRICAL WORKS
  • Completion Year: JULY 27, 2016

E.E. BLACK LTD.​

  • Project Name: 5 E COM CENTER PROJECT
  • Project Location: MALL OF ASIA COMPLEX, PASAY CITY
  • Scope: SUPPLY & INSTALLOF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS (14
    FLOOR)
  • Completion Year: MAY 31, 2016

DIVERSIFIED TECHNOLOGY SOLUTIONS INT'L., INC.

  • Project Name: REED ELSEVIER BLDG. OFFICE
  • Project Location: UP AYALA TECHNO HUB Q.C.
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS WITH MECHANICAL WORKS(2ND FLOOR- BUILDING)
  • Completion Year: MAY 31, 2016

UNILEVER PHILIPPINES

  • Project Name: UNILEVER BAYANIHAN OFFICEFIT-OUT
  • Project Location: BGC TAGUIG CITY
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS ( 7TH TO 11TH FLOOR )
  • Completion Year: APRIL 18, 2016

TOTAL VENTURES, INC.

  • Project Name: NASDAQ
  • Project Location: BGC TAGUIG CITY
  • Scope: SUPPLY & INSTALL OF MATERIALS, LABOR & SUPERVISION FOR ELECTRICAL WORKS & FDAS
  • Completion Year: FEBRUARY 16, 2016

MERALCO MSERVE ENERGY SERVICES COMPANY

  • Project Name: PARADIGM
  • Project Location: ORTIGAS, PASIG CITY
  • Scope: SUPPLY OF MATERIALS, LABOR, SUPERVISION, INCLUDING TOOLS AND EQUIPMENT
  • Completion Year: JANUARY 14, 2016